Designed, built, and stood behind.

Four practices under a single name, from the first site visit to the support that keeps a room running years later.

Consulting

The thinking comes first.

Every design begins with the room, your team, and the way you work.

You leave the first conversation with a clear design, equipment chosen on merit, and a price you can rely on.

System integration

Built in-house, layer by layer.

Sound, screens, controls, and network are designed as one system.

Each system runs in full on the bench before it reaches site. The room starts with one touch, and behaves in year five as it did on day one.

Documentation

Handed over complete.

Every room is labeled, documented, and handed over with its full record.

Drawings, test results, and guides your team can follow. Years from now, the next person can run the room with confidence.

ABCDEFABCDEF123123TABLERACK · CREDENZAROOMTABLE · USB-CTABLE · HDMIWIRELESS CASTCEILING MICS ×2TOUCH PANEL 10″PRESENTATION SWITCHERAUDIO PROCESSORAMPLIFIERROOM CONTROLLERNETWORK SWITCH123ADISPLAY · 98″CEILING SPEAKERS ×6CEILING WI-FIV-101 · USB-CV-102 · HDMIV-103 · CASTV-104 · VIDEOA-201 · AUDIOA-210SP-301 · SPEAKERC-401 · CONTROLN-501 · NETWORKN-500 · UPLINKAS-BUILTREVDATEDESCRIPTIONR01984-01-24ISSUED FOR CONSTRUCTIONR12026-11-18AS-BUILT · FIELD CHANGES RECORDEDMANTIS AUDIOVISUALAV engineered end to end · in-housePROJECTclient kept privateSHEETAV-401 · SIGNAL FLOWROOMBOARDROOM 4SCALENTSISSUEAS-BUILT · R1
One sheet from the set that ships with every room.Every cable numberedDetailed to the portRevised to as-built before handover

Monitoring & support

Fixed before you noticed.

Every room is monitored remotely after handover.

A developing fault is identified early and resolved in a scheduled maintenance window. When you call, you reach the engineer who built the room, the same business day.

840SATSUNMONDEVICES ONLINE · ONE FLEETSAT 19:44 · EIGHTH DEVICE ENROLLEDSUN 04:36 · ONE DEVICE DOWN, TWICE · BACK IN 3 MIN04:3604:48
Sixty-eight hours from a live fleet under watch. One device dropped at 04:36 on Sunday and was back within three minutes, logged in full.Real telemetry · identifiers withheldSixty-eight hours · continuous watchSix brief interruptions · all logged

A documented path from survey to support.

The same five stages on every project, from a single room to a forty-floor rollout.

Survey

Every project starts on site: the space walked, the room measured, every source and constraint mapped.

Design

Sound, controls, and network designed as one system, down to the test the room will be signed off against.

Build

Proven on the bench, then installed, calibrated, and signed off on site.

Hand over

Drawings, records, and plain-language guides. Your team runs the room on its own.

Support

The room stays monitored, and the engineer who built it stays on call.

Common questions.

What teams ask before the first survey.

Why not just buy the kit and have IT install it?

Off-the-shelf equipment is good. Performance is decided between the boxes: how the devices are integrated, tuned, and kept in step over time. That is the work.

Will you work alongside our existing IT and contractors?

Yes. Mantis owns the AV signal chain and coordinates at the network and structural boundaries. Each boundary is written into the drawings.

Can you take on a multi-room or multi-site rollout?

Yes. One standard is set, and a documented process holds it across every room, the first and the four-hundredth alike. Each room is commissioned to its own signed record and monitored from one place.

How are firmware and updates handled after handover?

On a planned schedule, tested before they reach a live room. You receive a note of what changed.

What if we want another firm to maintain it later?

Every room ships with full as-built drawings and a signed commissioning record. Your own team or any competent integrator can run and extend the system from the documentation.

Where have you delivered?

Across continents, for enterprise, government, healthcare, academic, and broadcast organizations. The work, by industry shows the rooms, with every name kept under NDA.

Start while it’s still on paper.

Thirty minutes with the engineer who would design your room. You leave with the drawing-stage problems named.

Only a handful of rooms are in design at any one time.