Four practices under a single name, from the first site visit to the support that keeps a room running years later.
The thinking comes first.
Every design begins with the room, your team, and the way you work.
You leave the first conversation with a clear design, equipment chosen on merit, and a price you can rely on.
Built in-house, layer by layer.
Sound, screens, controls, and network are designed as one system.
Each system runs in full on the bench before it reaches site. The room starts with one touch, and behaves in year five as it did on day one.
Handed over complete.
Every room is labeled, documented, and handed over with its full record.
Drawings, test results, and guides your team can follow. Years from now, the next person can run the room with confidence.
Fixed before you noticed.
Every room is monitored remotely after handover.
A developing fault is identified early and resolved in a scheduled maintenance window. When you call, you reach the engineer who built the room, the same business day.
The same five stages on every project, from a single room to a forty-floor rollout.
Every project starts on site: the space walked, the room measured, every source and constraint mapped.
Sound, controls, and network designed as one system, down to the test the room will be signed off against.
Proven on the bench, then installed, calibrated, and signed off on site.
Drawings, records, and plain-language guides. Your team runs the room on its own.
The room stays monitored, and the engineer who built it stays on call.
What teams ask before the first survey.
Off-the-shelf equipment is good. Performance is decided between the boxes: how the devices are integrated, tuned, and kept in step over time. That is the work.
Yes. Mantis owns the AV signal chain and coordinates at the network and structural boundaries. Each boundary is written into the drawings.
Yes. One standard is set, and a documented process holds it across every room, the first and the four-hundredth alike. Each room is commissioned to its own signed record and monitored from one place.
On a planned schedule, tested before they reach a live room. You receive a note of what changed.
Every room ships with full as-built drawings and a signed commissioning record. Your own team or any competent integrator can run and extend the system from the documentation.
Across continents, for enterprise, government, healthcare, academic, and broadcast organizations. The work, by industry shows the rooms, with every name kept under NDA.
Thirty minutes with the engineer who would design your room. You leave with the drawing-stage problems named.
Only a handful of rooms are in design at any one time.